A geotechnical report is an important document required for building consent in New Zealand because it provides information about the site’s soil and ground conditions.
Read More
A Geotechnical desk study is an important preliminary investigation that is typically conducted as part of the pre-feasibility study for a construction project.
Read More
SOIL-ENG plays a critical role in facilitating and supervising the drilling of boreholes for a geotechnical investigation. Here are some reasons why SOIL-ENG is required for this task:
Read More
Councils in New Zealand require a geotechnical engineer to identify geohazards for areas under development because New Zealand has a high level of seismic activity…
Read More
A geotechnical site field investigation is necessary for various reasons, including identifying soil and rock properties, geological hazards, and other ground conditions…
Read More
A ground model is an essential component of a geotechnical design report as it provides critical information on the site’s soil and rock properties, geological features…
Read More
The design of foundations involves the integration of various data sources, including lab tests, geotechnical site investigation, geology maps, insitu geotechnical testing…
Read More
Several different ground improvement methods can be used to improve foundation founding conditions. The selection of a particular method depends on the geotechnical…
Read More
The purpose of geotechnical instrumentation is to monitor and measure the behaviour of soil, rock, and structures under different conditions and loads…
Read More
Liquefaction analysis is done to assess the susceptibility of soils to liquefaction, which is a phenomenon where soil loses its strength and stiffness and behaves like a…
Read More
The purpose of carrying out earthworks compaction control is to ensure that the soil being used for construction or engineering purposes is compacted…
Read More
Lateral support design is done to prevent soil from moving laterally and to provide stability to excavations, retaining walls, and other structures…
Read More
Pre-loading an area refers to the process of applying a compressive load to a soil or rock layer to consolidate it before starting construction.
Read More
A slope stability analysis is a critical step in the design and construction of structures built on or adjacent to sloping ground. The main reasons for performing…
Read More
We value our client relationships and work diligently to achieve the best outcomes for projects and properties.
Our feedback speaks for itself: